ISTQB Dumps 2013 with answers
ISTQB Dumps 2013, Dumps for ISTQB 2013, ISTQB Dumps with Answers
This page contains sample questions taken form a website for Dumps of ISTQB 2013 , Practice these ISTQB Dumps 2013 Questions and get certified in Testing for the year 2013 to get the most valuable Testing Certification
Here is the original Link:
http://www.placementyogi.com/istqb-dumps/istqb-dump-1/1 http://www.placementyogi.com/istqb-dumps/istqb-dump-1/2 1 When what is visible to end-users is a deviation from the specific or expected behavior, this is called: | ||
an error
| ||
a fault
| ||
a failure
| ||
a defect
| ||
a mistake
|
2 |
Regression testing should be performed:
v) every week
w) after the software has changed
x) as often as possible
y) when the environment has changed
z) when the project manager says
| |
v & w are true, x – z are false
| ||
w, x & y are true, v & z are false
| ||
w & y are true, v, x & z are false
| ||
w is true, v, x y and z are false
| ||
All of the Above
|
3 |
IEEE 829 test plan documentation standard contains all of the following except:
| |
test items
| ||
test deliverables
| ||
test tasks
| ||
test environment
| ||
test specification
|
4 |
Testing should be stopped when:
| |
all the planned tests have been run
| ||
time has run out
| ||
all faults have been fixed correctly
| ||
both a) and c)
| ||
it depends on the risks for the system being tested
|
Comments
Post a Comment