ISTQB Dumps 2013 with answers

ISTQB Dumps 2013, Dumps for ISTQB 2013, ISTQB Dumps with Answers

This page contains sample questions taken form a website for Dumps of ISTQB 2013 , Practice these ISTQB Dumps 2013 Questions and get certified in Testing for the year 2013 to get the most valuable Testing Certification




Here is the original Link:
http://www.placementyogi.com/istqb-dumps/istqb-dump-1/1
http://www.placementyogi.com/istqb-dumps/istqb-dump-1/2

1 When what is visible to end-users is a deviation from the specific or expected behavior, this is called:
A.
an error
B.
a fault
C.
a failure
D.
a defect
E.
a mistake

2





Regression testing should be performed:
v) every week
w) after the software has changed
x) as often as possible
y) when the environment has changed
z) when the project manager says
A.
v & w are true, x – z are false
B.
w, x & y are true, v & z are false
C.
w & y are true, v, x & z are false
D.
w is true, v, x y and z are false
E.
All of the Above

3
IEEE 829 test plan documentation standard contains all of the following except:
A.
test items
B.
test deliverables
C.
test tasks
D.
test environment
E.
test specification

4
Testing should be stopped when:
A.
all the planned tests have been run
B.
time has run out
C.
all faults have been fixed correctly
D.
both a) and c)
E.
it depends on the risks for the system being tested

Comments

Popular posts from this blog

Cryptarithmetic Problems with solution for eLitmus pH Test CAT Cryptarithmetic

CyberLink YouCam Dark Image Solution

IBPS PO Mains Mock Tests for Free